Usually before turning on the coil slitting machine, the staff should first complete a series of checks to confirm the normal before turning on the equipment into the working state. Of course, at the same time also need to do a good job of preparation, such as to combine the actual processing requirements, early to prepare the roll core loaded to the winding shaft, and the slitting machine winding shaft placed in the winding seat, centered on the placement of the rolls of the orientation.
You also need to press the knife seat down button, which is mainly to facilitate the pressure roller pressure to the slitter equipment on the winding roll surface. After the appropriate adjustment of the lower cutter, so that the knife and the winding shaft of the core tube seams a correct, and then lock the lower knife. In addition, the upper knife shaft should be adjusted appropriately, so that the upper and lower knives are involved in the depth of about 1.5 millimeters. Tighten the upper knife edge, so that the force is uniformly clamped.
After the above adjustment work is completed, the field operator also needs to put the discharge shaft of the metal coil slitting machine into the core of the raw material roll, so that the slanting roll is located in the middle orientation, and then tighten the two ends of the cone top. After that, press the loading button, so that the material rolls automatically into the discharge seat, rotate the axis adjustment handwheel, adjust the material rolls in the middle of the machine orientation.
It should be noted that, when the staff to make the steel slitting machine equipment before the combination of winding power, should first make the equipment idle for a period of time, check the working parts of the machine with or without foreign objects, obstacles, and lubrication of all working parts. When the completion of a volume of material slitting work, should be disengaged from the winding power, press the unloading button, the volume of material will be by the hydraulic rocker arm active and smooth down the material roll to the ground.
After the completion of the production work, the staff also need to record about the day's coil slitting machine equipment running records and production of daily output and other work. And to clean up the site environment and equipment in a timely manner to ensure that the slitting machine equipment neat, good environment, and cut off the power switch before work.